Skip to content
Pacific CoastCONTRACTING

Job photos

Work from San Diego houses.

Real surfaces from Pacific Coast Contracting jobs. Captions describe what is in the frame. The office is at 7915 Silverton Ave Ste 302, San Diego, CA 92126. Call or text (619) 972-3798.

Before and after

Only pairs shot on the same surface. Nothing here is a stock comparison.

Before: wood forms and rebar laid out for a concrete pad beside a green metal building
After: finished poured concrete pad in the same yard beside the green metal building
BeforeAfter

Concrete pad

Same pad. Forms and rebar are first. The second frame is that pad after the concrete was poured and finished.

Before: open drywall above a laundry washer, with framing and a plywood panel exposed in the ceiling bulkhead
After: finished textured and painted drywall ceiling above the same laundry washer
BeforeAfter

Laundry bulkhead

Same drywall above the washing machine. The open framing is first. The second frame is that bulkhead after it was patched, textured, and painted.

Before: cracked and missing stucco on the underside of an overhang above a garage door
After: repaired stucco overhang above garage doors on a beige building, with ladders still on site
BeforeAfter

Stucco overhang

Same garage overhang. Cracked stucco with a missing chunk is first. The second frame is that overhang after the stucco was repaired and refinished.

Square cutout in a concrete porch with a gas pipe, looking out over a San Diego hillside
Dark new concrete slab in a covered porch, with a white van parked below
BeforeAfter

Porch slab

Same covered porch. The open patch is first. The dark slab is that opening after it was poured.

Broken concrete and rubble along the base of exposed wall studs
New smooth concrete stem wall under exposed studs, with orange buckets nearby
BeforeAfter

Stem wall

Same wall line. Broken concrete along the studs, then a new stem poured in that joint.

Unpainted corner with a dark built-in cabinet and stained walls
Finished white room with a painted corner cabinet and a chandelier
BeforeAfter

Corner room

Same corner cabinet and window. Stained walls first, then the room after the walls and cabinet were painted.

Finished surfaces

16 finished photos

Paint, stucco, drywall, concrete, and siding after the surface work. We do not remodel houses.

On the job

120 more photos

Prep, open ceilings, and the rest of the camera roll from sites the crew was on. Captions describe the frame.

Call(619) 972-3798Text(619) 972-3798Free estimate